Patriot Drills 104.5 m of 0.97% Li2O and 61.9 m of 1.42% Li2O, and Extends Strike Length of Mineralization to 2.2 km at the CV5 Pegmatite, Corvette Property, Quebec

Vancouver, BC, Canada Highlights Significant Intercepts Continued wide and high-grade drill intercepts returned from the CV5 Pegmatite over a significant lateral distance between holes 0.97% Li2O over 104.5 m (124.7 m to 229.3 m), including 1.52% Li2O over 51.9 m (CV22-052) 1.42% Li2O over 61.9 m (214.0 m to 275.9 m), including 2.00% Li2O over […]